Sunday 8 May 2011

04th May 2011 - Whitepit

Estelle Sandford, Mike Moxon, Mark Denning & Stu Gardiner

Stu and Mark finally rebolted the entrance ladder with 4x M10 stainless steel bolts to replace the rusty M6 'temporary' fixings, all that needs to be done now is to fix the bottom of the ladder to the ground and to support the mid section against the concrete pipe or railway track support.

Mike and Estelle went to the end to dig / clear remaining spoil from the previous banging trip. Stu and Mark joined them later after fixing the ladder although the air was very bad with the bang fumes still lingering in the air.

Time underground: 2.5 hours

No comments: