Monday 6 August 2012

White Pit - 6/6/12 - back to the dig!

Estelle Sandford & Mark Denning
1.5hrs digging the end.
Mike failed to turn up on time, it was peeing with rain so we decided to give up the idea of cementing in favour for a dig at the end to clear the bang we laid back in Jan. Filled about a dozen bags until we ran out and then moved most of them up ready to haul and Mark carried on digging spoil out. The bang has done a good job and lots of fractured rock/stal, but reckon we’ll need another once we’ve cleared this. Sort of think we can hear space beyond, also at one point there did seem to be a draught, although the air was generally poor! We need to get this air tested for CO2 levels at some point soon… Looked at side opposite to the shoring on way in, we need to look at finding a way of making that safer as it looks like it has the potential to all come in and collapse rather than just slump and because of our new route in, we are caving more to the left now than before. We also need to have a damn good clearout in there as the place is minging with mouldy bags and other rotting vegetation we’ve left behind…

No comments:

Post a Comment